Skip to content

Pull requests: openshift/release

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

NO-JIRA: add new externaloidc tpnu presubmit jobs for hypershift that only run on 4 specific file changes jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#78918 opened May 6, 2026 by ehearne-redhat Loading…
telco5g/ptp: fail fast when cluster nodes are not Ready approved Indicates a PR has been approved by an approver from all required OWNERS files.
#78917 opened May 6, 2026 by edcdavid Contributor Loading…
CRC: use Intel Cascade Lake as cpu platform for n2-standard-16 type approved Indicates a PR has been approved by an approver from all required OWNERS files.
#78916 opened May 6, 2026 by praveenkumar Contributor Loading…
remove the ignore differences configuration for that app.ci cluster in ArgoCD approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#78915 opened May 6, 2026 by droslean Member Loading…
Sync Serverless CI config/ needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#78913 opened May 6, 2026 by serverless-qe Contributor Loading…
hypershift: use pre-built hypershift-tests image for 4.22 approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#78912 opened May 6, 2026 by csrwng Contributor Loading…
2 tasks
trusted-execution-clusters: No package installation for provisioning approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#78910 opened May 6, 2026 by Jakob-Naucke Member Loading…
Fix Jira env vars in OCM Prow jobs
#78909 opened May 6, 2026 by andclt Contributor Loading…
red-hat-storage: tag AWS CI clusters with USER_TAGS approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#78907 opened May 6, 2026 by malayparida2000 Contributor Loading…
OCM-23826 | feat: cs-rosa-hcp-backup-restore-integration-main
#78906 opened May 6, 2026 by andclt Contributor Loading…
OVNK BGP: stop overriding FRR image for techpreview jobs approved Indicates a PR has been approved by an approver from all required OWNERS files.
#78904 opened May 6, 2026 by jcaamano Contributor Loading…
Prow jobs creation for the pipelines-docs-1.23 branch approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#78903 opened May 6, 2026 by Dhruv-Soni11 Contributor Loading…
AROSLSRE-780: Onboard Azure/ARO-Tools to Prow approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#78902 opened May 6, 2026 by raelga Contributor Loading…
2 tasks
Add red-hat-konflux as trusted app for ALBO and EDO repos approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#78901 opened May 6, 2026 by alebedev87 Contributor Loading…
WINC: Add cucushift-installer-wait to winc workflow test sections
#78899 opened May 6, 2026 by rrasouli Contributor Loading…
OCM-24534 | feat: Migrate cs-rosa-hcp-upgrade-staging-main to Prow pe… approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#78896 opened May 6, 2026 by l-urbini Contributor Loading…
[PERFSCALE-4583] Execution of Control plane baseline tests with different churn rates on 120 node Telco Core RDS Cluster approved Indicates a PR has been approved by an approver from all required OWNERS files. network-access-rehearsals-ok rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#78895 opened May 6, 2026 by sraviteja-maker Contributor Loading…
[WIP] Limit MCE compatibility matrix to 2 latest HUB and 2 latest MCE do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#78894 opened May 6, 2026 by mgencur Contributor Loading…
add the workflow and jobs for roas classic approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#78893 opened May 6, 2026 by bmeng Contributor Loading…
OCPBUGS-85081: OpenStack: fix rhcos name/content mismatch in upgrade jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#78889 opened May 6, 2026 by mandre Member Loading…
[DNM] confirm baseline for a job
#78888 opened May 6, 2026 by orenc1 Contributor Loading…
OCM-23824: Migrate OSD GCP non-cross-project WIF FVT job to Prow approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#78887 opened May 6, 2026 by bmeng Contributor Loading…
WIP: test approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#78886 opened May 6, 2026 by pacevedom Contributor Draft
ProTip! Exclude everything labeled bug with -label:bug.